Ümraniye-Ataşehir-Göztepe Metro Line
İstanbul/Türkiye
2025
-
Gülermak Nurol Makyol JV
SCOPE OF WORK |
||
34.5 kV Switchboard System |
||
34.5 kV/0.4 kV Auxiliary Service Transformer |
||
Rectifier-Transformer / Rectifier System |
||
Earthing and Bonding System |
||
UPS, Battery and Battery Charging Equipments |
||
Stray Current and Corrosion Monitoring System |
||
Low Current and Low Voltage Distribution Cables |
||
Overhead Conductor Rail System OCRS |
||
34.5 kV Underground Power Cable |
||
Busbar Power Distribution Systems |
||
0.4 kV AG Main Distribution Panels |
||
Earthing System Supply and Installation |
||
Tunnels and Stations Signalling System Cabling and Device Installation |
||
MCC Panels Supply and Installation |
||
Control and Communication System Design |
||
Transmission System |
||
Phone System, Radio System |
||
Radio System Leaky Cable Supply and Installation |
||
Audio & Public Address System, CCTV System, Synchronized Clock |
||
Access Control System |
||
Supervisory Control and Data Acquisition (SCADA) Environmental |
||
System Station Information Management System(ECS/SIMS) |
||
Fire Detection and Alarm System |
||
Low Voltage System and Lighting System |
||
Running Tunnels Low Voltage System and Lighting System |